So, this is embarrasing. I am new to PowerBI and want to setup a custom visual. I can't even run the 'update count' example which is provided as the defaut code for a new custom visual.
After is setup the new project:
pbiviz new test
Enable developer tools etc in PowerBI. And insert the visual. The visual shows Update Count 0. The Console shows the 'Visual Constructor' line.
When I change the figure, the update count does not change. The console also does not show the 'Visual update' output. I am not sure that 'update' has even been called.
Have I broken somthing? How do I get it to work?
Thanks in advance.
Mark