Hello
First post from a newbie.
I want to set up a refresh time for a report that has source data from three places:
1) a view from sql
2) an excel spreadsheet on our network
3) a calendar table that I copied into the report
We have set up a gateway for the view. This alone seems to work if I delete the other two sources. In another test, I deleted the calendar table and left the other two sources. The gateway says I have links to the view and spreadsheet but still says that I am missing a link?
If we can get the first two to allow me to set up a refresh time, then I need to know how to insert the calendar table that was copied in.
Virtually all our systems are on premise.
I hope this makes sense. I really appreciate any help you can provie on my journey with Power BI
Justin